Humke + Slottke Engineering GmbH
Year Plant / Country Technical Installation Work Carried Out Customer
2016/2018 HKW Wilmersdorf Berlin boiler plant with district heating pump station commissioning and coordination STAR Germany GmbH/ Vattenfall New Projects
2016 – 2018 KW Moorburg Hamburg/Deutschland boiler plant included balance of plant coordination maintenance MHPE/ Vattenfall Generation
2016 – 2017 Currenta Dormagen 10 three-pass-quickstart-boiler commissioning of systems further commissioning management Bilfinger Eng. + Tech. GmbH
2015 EfW Plymouth/ UK Water steam cycle Commissioning management Imtech power / MVV
2014 EfW Trondheim/N
line 1 and 2
Flue gas treatment Site manager scrubber upgrade and district heating extension Hitachi Zosen Inova / STATKRAFT
2012 – 2015 KW Moorburg-Hamburg/ Germany Coal fired power plant Commissioning balance of plant/ boiler/water steam cycle EWEX Engineering / Hitachi Europe Power
2011 – 2014 Chemelot-Geleen EdeA/ Netherlands Gas fired boiler F 3700 und F 3800 Site erection manager, 2013/14 project management Borsig Boiler Systems GmbH
2005 – 2007 TAN Nürnberg/ Germany Power generating plant fuelled by waste
Waste water treatment plant
Transformation of the existing HCL production to a CaCl2 evaporation system, engineering, dismantling, construction, commissioning, trial run, ASO Von Roll Inova AG
2005 TREA Breisgau/ Germany Power generating plant fuelled by waste, flue gas treatment plant Trouble-shooting in dry and wet flu gas treatment plant, catalytic denitrification (high dust KAT), optimisation of the treatment plant in compliancy with regulations Von Roll Inova AG
2001 KW Lauswardt/ Germany Water tube boiler Commissioning after upgrading Eisenwerke Baumgarte GmbH
2001 KW Amercentrale
near Tilsburg/ Netherlands
Water tube boiler Commissioning and optimisation Eisenwerke Baumgarte GmbH
2000 Neu-Ulm/ Germany Steam generator after sewage sludge combustion Commissioning and optimisation after upgrading (boiler, water/steam-cycle, BoP, ASO) Eisenwerke Baumgarte GmbH
1999 HKW Senftenberg/ Germany Steam generator Engineering cleaning process of the stem generator, supervision of the cleaning procedure, boil-out GEC Alstom
1999 SOCAR / France Steam generator Engineering, delivery specification, checking of offers, and evaluation of the first bidder Babcock Omnical
1999 EPZ Amer 9/ Netherlands Water tube boiler Engineering, preparation of the operation manual and documentation Eisenwerke Baumgarte GmbH
1999 UNELCO – Canary Islands: Gran Canary and Tenerife Condensators Diagnosis of the corrosion protection and evaluation of the corrosion risk ABB TDL/C Kraftwerke AG Mannheim
1998 – 1999 Lang Papier Ettlingen/ Germany Steam generators delivery specification, checking of offers and evaluation of the first bidder, PID diagrams, descriptions for permissions, ASO Babcock Omnical GmbH
1998 Energieversorgung Lower Austria – MHKW Dürnrohr/ Austria Water/steam cycle Evaluation , pre-project construction of a power plant fuelled by waste, integration of the new power generating plant fuelled by waste into the existing power plant Umwelt- und Verfahrenstechnik Neubacher und Partner
1996 RMHKW Böblingen/ Germany Water treatment plant Delivery specification and evaluation of the first bidder ABB Turbinen Nürnberg
1996 MHKW Offenbach/ Germany Power generating plant fuelled by waste Preparation of the power plant operation manual Lentjes Entsorgungs GmbH
1996 MHKW Iserlohn/ Germany Steam generators Personal training SUMITOMO H.I. (Japan) Eisenwerke Baumgarte GmbH