Year | Plant / Country | Technical Installation | Work Carried Out | Customer |
---|---|---|---|---|---|
![]() |
2016/2018 | HKW Wilmersdorf Berlin | boiler plant with district heating pump station | commissioning and coordination | STAR Germany GmbH/ Vattenfall New Projects |
![]() |
2016 – 2018 | KW Moorburg Hamburg/Deutschland | boiler plant included balance of plant | coordination maintenance | MHPE/ Vattenfall Generation |
![]() |
2016 – 2017 | Currenta Dormagen | 10 three-pass-quickstart-boiler | commissioning of systems further commissioning management | Bilfinger Eng. + Tech. GmbH |
![]() |
2015 | EfW Plymouth/ UK | Water steam cycle | Commissioning management | Imtech power / MVV |
![]() |
2014 | EfW Trondheim/N line 1 and 2 |
Flue gas treatment | Site manager scrubber upgrade and district heating extension | Hitachi Zosen Inova / STATKRAFT |
![]() |
2012 – 2015 | KW Moorburg-Hamburg/ Germany | Coal fired power plant | Commissioning balance of plant/ boiler/water steam cycle | EWEX Engineering / Hitachi Europe Power |
![]() |
2011 – 2014 | Chemelot-Geleen EdeA/ Netherlands | Gas fired boiler F 3700 und F 3800 | Site erection manager, 2013/14 project management | Borsig Boiler Systems GmbH |
![]() |
2005 – 2007 | TAN Nürnberg/ Germany | Power generating plant fuelled by waste Waste water treatment plant |
Transformation of the existing HCL production to a CaCl2 evaporation system, engineering, dismantling, construction, commissioning, trial run, ASO | Von Roll Inova AG |
![]() |
2005 | TREA Breisgau/ Germany | Power generating plant fuelled by waste, flue gas treatment plant | Trouble-shooting in dry and wet flu gas treatment plant, catalytic denitrification (high dust KAT), optimisation of the treatment plant in compliancy with regulations | Von Roll Inova AG |
![]() |
2001 | KW Lauswardt/ Germany | Water tube boiler | Commissioning after upgrading | Eisenwerke Baumgarte GmbH |
![]() |
2001 | KW Amercentrale near Tilsburg/ Netherlands |
Water tube boiler | Commissioning and optimisation | Eisenwerke Baumgarte GmbH |
![]() |
2000 | Neu-Ulm/ Germany | Steam generator after sewage sludge combustion | Commissioning and optimisation after upgrading (boiler, water/steam-cycle, BoP, ASO) | Eisenwerke Baumgarte GmbH |
![]() |
1999 | HKW Senftenberg/ Germany | Steam generator | Engineering cleaning process of the stem generator, supervision of the cleaning procedure, boil-out | GEC Alstom |
![]() |
1999 | SOCAR / France | Steam generator | Engineering, delivery specification, checking of offers, and evaluation of the first bidder | Babcock Omnical |
![]() |
1999 | EPZ Amer 9/ Netherlands | Water tube boiler | Engineering, preparation of the operation manual and documentation | Eisenwerke Baumgarte GmbH |
![]() |
1999 | UNELCO – Canary Islands: Gran Canary and Tenerife | Condensators | Diagnosis of the corrosion protection and evaluation of the corrosion risk | ABB TDL/C Kraftwerke AG Mannheim |
![]() |
1998 – 1999 | Lang Papier Ettlingen/ Germany | Steam generators | delivery specification, checking of offers and evaluation of the first bidder, PID diagrams, descriptions for permissions, ASO | Babcock Omnical GmbH |
![]() |
1998 | Energieversorgung Lower Austria – MHKW Dürnrohr/ Austria | Water/steam cycle | Evaluation , pre-project construction of a power plant fuelled by waste, integration of the new power generating plant fuelled by waste into the existing power plant | Umwelt- und Verfahrenstechnik Neubacher und Partner |
![]() |
1996 | RMHKW Böblingen/ Germany | Water treatment plant | Delivery specification and evaluation of the first bidder | ABB Turbinen Nürnberg |
![]() |
1996 | MHKW Offenbach/ Germany | Power generating plant fuelled by waste | Preparation of the power plant operation manual | Lentjes Entsorgungs GmbH |
![]() |
1996 | MHKW Iserlohn/ Germany | Steam generators | Personal training SUMITOMO H.I. (Japan) | Eisenwerke Baumgarte GmbH |